Excavation · Peachland
Glen Lake Reservoir Expansion.
Reservoir expansion works for the District of Peachland at Glen Lake, including dewatering, borrow pits, riparian works and 600 cubic metres of topsoil, delivered in a sensitive watershed.
The job.
The District of Peachland expanded its water storage at Glen Lake, and Scott Contracting & Excavating delivered the earthworks: dewatering, borrow pit development, riparian works and around 600 cubic metres of topsoil placed across the finished surfaces.
Working in a community watershed sets the rules. Everything on the job, from dewatering discharge to how the borrow pits were cut and reclaimed, ran to keep the water clean downstream of us.
The reservoir works were completed through 2011, and the job still stands as a reference point for our civil and environmental earthworks. It is also the line of work the company was founded on: excavation, done carefully, in places that matter.
At a glance
Request a quote
Tell us about your project.
Send the basics and we'll come back with next steps, usually a site walk. Prefer the phone? Call 250-768-1118.