A Division of The Roc Doc Ventures Ltd. West Kelowna, BC  ·  250-768-1118

Selected work

The work speaks.

A selection of recent jobs: what the site was, what we did, and how it finished.

Prince Rupert

Harbour View Gardens

Demolition of eight eightplex buildings with comprehensive hazardous materials abatement, completed ahead of schedule.

October 2024 8 eightplexes

West Kelowna

Pine Acres Retirement Home

Abatement and full demolition of the former Pine Acres Retirement Home, a well-built structure with industrial infrastructure that served the Westbank First Nation community for many years.

June 2025 44,000 ft²

Castlegar

Eremenko Building

Asbestos abatement, demolition and backfill of the 20,000 square foot Eremenko Building on Columbia Avenue for the City of Castlegar, taken down over a Kootenay winter.

February 2026 20,000 ft²

Penticton

Penticton Toyota

Abatement and demolition of a fire-damaged structure at the Toyota dealership in Penticton, including engineered bracing of compromised concrete walls and crane-assisted removal of heavy debris.

September 2022 Post-fire

Penticton

Appleton Waste Clean-Up

Full site environmental remediation on Penticton Indian Band IR#1. Sorting, removal and disposal of roughly 3,360 tonnes of mixed waste and debris across three lots, with every pile tested.

2023 3,360 tonnes

Summerland

Summerland Church

High-risk vermiculite and asbestos abatement followed by demolition of a 12,000 square foot church, clearing the site for BC Housing's Turning Point affordable housing. On time, zero incidents.

February 2025 12,000 ft²

Penticton

SS Sicamous

High-risk asbestos abatement aboard the SS Sicamous, the heritage sternwheeler on Penticton's lakeshore, for the City of Penticton. Boiler and pipe insulation removed with the ship preserved, cleared by independent inspection.

2025 Heritage sternwheeler

Kelowna

Okanagan College H Building

Demolition and abatement of a 52,000 square foot structure on a live campus, sequenced around college operations, with 85 percent of material diverted from landfill.

September 2021 52,000 ft²

Kelowna

Canadian Tire Automotive

Selective interior demolition in a live commercial building. Hoists, underground lines, tank and reinforced slab out, 82 percent of material recycled, handed back ready for fit-out.

November 2025 255 tonnes

Kelowna

Parkinson Recreation Centre

Hazardous material abatement at Kelowna's Parkinson Recreation Centre for Bird Construction, ahead of the city's largest recreation infrastructure project.

October 2025 Major civic project

Cranbrook

Briar Avenue Cleanup

Demolition and cleanup of a derelict hazmat site for the City of Cranbrook. Around 3,000 tonnes of waste out in a month, with everything recyclable separated from co-mingled hazardous material.

2025 ~3,000 tonnes

Kamloops

Rock Crushing Services

Rock crushing services for the City of Kamloops at the Civic Operations Yard, turning stockpiled rock into usable aggregate under a municipal services contract.

Ongoing Municipal services

Salmon Arm

Salmon Arm Memorial Arena

Abatement and demolition of the SASCU Indoor Memorial Sports Complex for the City of Salmon Arm, taken down beside the lake with the pad left clean and graded.

2025 Timber barrel-roof arena

Rossland

Paterson Port of Entry

Phased demolition at the Paterson port of entry south of Rossland, clearing federal border infrastructure in stages so the crossing keeps operating throughout.

In progress Federal border crossing

Northern BC

School Fire Loss

Demolition and clearing of a fire-destroyed school in a northern First Nations community, run through winter for the insurer. Remote mobilization, the kind of distance most outfits will not quote.

2026 First Nations community

Vernon

House Fire Abatement

Post-fire hazardous material abatement in a Vernon home, sealed room by room and cleared under containment before restoration could start.

2025 Structure fire

Peachland

Glen Lake Reservoir Expansion

Reservoir expansion works for the District of Peachland at Glen Lake, including dewatering, borrow pits, riparian works and 600 cubic metres of topsoil, delivered in a sensitive watershed.

2011 Dam and reservoir works

Your job could be next.

Send us the site details and we will come back with scope, sequence and a timeline you can build around.

Request a Quote

Request a quote

Tell us about your project.

Send the basics and we'll come back with next steps, usually a site walk. Prefer the phone? Call 250-768-1118.

We respond during business hours, usually same day.

Sending the form means we use these details to contact you about your request, nothing more. See our privacy policy.